Build Your Factory in Saudi Arabia
We guide you through the entire industrial setup: from MISA licensing and Environmental Permits to securing low-cost land in MODON cities.
Status
Production Ready
SIDF Loan Eligibility
75% Approved
The Industrial Powerhouse
Through the National Industrial Development and Logistics Program (NIDLP), Saudi Arabia offers the world’s most competitive energy prices and financial incentives to become a global manufacturing hub.
- Subsidized Energy Tariffs
- SIDF Loans (Up to 75% Capex)
- MODON Land Allocation (1 SAR/sqm)
Target Sectors
The Industrial Roadmap
MISA License
100% Foreign Ownership Industrial License.
Initial License
Preliminary approval from Ministry of Industry.
Land Allocation
Securing plot in MODON or Royal Commission.
Final License
Issued after factory construction & safety checks.
Manufacturing Success
Plastics Manufacturer
Origin: India
“Mehwar secured our land in Riyadh 2nd Industrial City within 4 weeks and guided us through the entire SIDF loan application.”
Electronics Assembly
Origin: South Korea
“Navigating the Ministry of Industry requirements was complex, but the team made it seamless. We are now fully operational.”
Visit Our HQ
Located in Riyadh, connecting you to MODON cities across the Kingdom.
- Malaz District, Riyadh, Saudi Arabia
- +966 50 947 9768
- info@businesssetup.company
Industrial FAQ
Start Your Factory
Get a feasibility assessment for SIDF loans.